Diagnóstico evaluativo del sistema de agua potable Gualay-Chaullayacu

dc.contributor.advisorPicón Abad, Julio Patricio
dc.contributor.authorTello Aguirre, Juana Gabriela
dc.contributor.cedula103848065es_ES
dc.coverageCuenca – Ecuadores_ES
dc.date.accessioned2020-08-13T17:31:24Z
dc.date.available2020-08-13T17:31:24Z
dc.date.issued2014
dc.descriptionEl presente trabajo investigativo se ejecutó en las comunidades de Gualay y Chaullayacu y tuvo como finalidad evaluar al Sistema de Agua Potable que las abastece, puesto que éste tenía algunos años de funcionamiento y presentaba falencias en el servicio. Para esto; mediante un censo, se registraron las conexiones de quienes cuentan con el servicio para presentar los cálculos más detallados de población actual, población de diseño y población futura, debido a que este sistema no era el único que brindaba el servicio de agua potable a estas comunidades.\n Como parte del proyecto, se hizo el recorrido completo del sistema con la ayuda de un GPS diferencial para el trazado de la red, diámetros, longitudes, cotas y ubicación geográfica de fuentes de abastecimiento, tuberías, tanques de almacenamiento, tanques rompe presiones, válvulas y usuarios. Con la ayuda del software WaterGems se fueron modelando y evaluando las condiciones en las que se encuentran funcionando éstos componentes en el año 2015 y cómo funcionará para el año 2035. \n Lo interesante de este trabajo investigativo es que el sistema estudiado cuenta con cuatro tanques de reserva; es decir, que para evaluarlo, a más de delimitar el área de servicio del sistema, se tuvo que dividir en sub áreas, bajo los parámetros de topografía y ubicación de usuarios. \n Se comprobó que el agua llegaba en malas condiciones a los habitantes de las comunidades por la falta de un correcto tratamiento de agua para potabilizar, ya que comparando los resultados de calidad de agua de la fuente, con el TULSMA (Texto Unificado de Legislación Ambiental Secundaria del Ministerio de Ambiente); el sistema necesita de un tratamiento previo de potabilización antes del de desinfección.\n Luego de realizada la evaluación, se determinó que la fuente de agua si abastecerá hasta el año 2035. La conducción funciona correctamente, los tanques existentes cumplen con el volumen para el 2035. Pero también, el sistema funciona con falencias en la potabilización y algunas zonas de presión elevada que deberán ser corregidas. Para esto, se recomienda analizar el trabajo investigativo de Santiago Quezada que es un complemento a esta evaluación.es_ES
dc.description.resumenThis research work was implemented inthecommunities of Chaullayacu and Gualay; and its purpose was to evaluatethe potable water systemthatsupplies them, because ithad manyyears of operation and also it hadfailuresin the service.For this purpose; a census was performed. It registered the current number of connections to estimate such as current population, design population and futurepopulation, because thissystemwas notthe only onewhich providespotablewater service to these communities.\n As a part of the proyecta complete track of the system witha differentialGPS was made to lay out the pipes, diameters, lengths, dimensions and location of supply source, pipes, reservoir tanks, break pressuretanks, valves and users.With the softwareWaterGEMS’s help, the system was laid out and evaluated in the current conditions under its components are operating in 2015 and how it will work in 2035.\n The interesting issue about this research work is that the system has four reservoir tanks; it means that to be evaluated, it needs not only a service area, but also it had to be divided into sub areas under the parameters of topography and users’ location.\n\n It was found that people from these communities are drinking water in bad conditions by lack of a correct treatment to purify the water, and comparing the quality results of fountain water with the TULSMA (Texto Unificado de Legislación Secundaria del Ministerio de Ambiente) (Ecuadorianstandard for waterdesigns); it can be seen that the system requires a pretreatment such as purification before the disinfection.\n\n After the evaluation, it was determined that the water font will be able to supply water up to 2035. The conduction is working correctly, the existing tanks provide with water volume up to the year 2035. However, the system is working without a purification system with many deficiencies in some high pressure areas that must be corrected. It´s recommended to analyze the investigative work of Santiago Quezada which work is a complement to this review.es_ES
dc.formatapplication/pdfes_ES
dc.format.extentxviii, 111 p.es_ES
dc.identifier.other5BT2014-TC17
dc.identifier.urihttps://dspace.ucacue.edu.ec/handle/ucacue/1813
dc.language.isospaes_ES
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rightsAtribución 4.0 Internacional
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/deed.es
dc.sourceUniversidad Católica de Cuencaes_ES
dc.sourceRepositorio Institucional - UCACUEes_ES
dc.subjectEvaluaciónes_ES
dc.subjectAgua Potablees_ES
dc.subjectPresiones Elevadases_ES
dc.subjectPotabilizaciónes_ES
dc.titleDiagnóstico evaluativo del sistema de agua potable Gualay-Chaullayacues_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES