Sede Azogues - Ingeniería Civil
URI permanente para esta comunidadhttps://dspace.ucacue.edu.ec/handle/ucacue/96
Examinar
Examinando Sede Azogues - Ingeniería Civil por Materia "AGUA RESIDUAL"
Mostrando 1 - 1 de 1
- Resultados por página
- Opciones de ordenación
Ítem Acceso Abierto Diseño del nuevo sistema de alcantarillado y planta de tratamiento para el sector Queseras de la comunidad de Chuichun, cantón El Tambo provincia del Cañar(Universidad Católica de Cuenca., 2018) Buñay Yugsi, Edisón Fredy; Romero González, Rómulo Ricardo; 0302727631; ., .This following project deals with the design of a new sewer system and murky-water treatment plant leaded to the inhabitants of a place called “Queseras” – a small village that belongs to the community of Chuichun located in el canton El Tambo, Cañar province. Certain criteria and parameters established by the INEN- Ecuadorian standardization were taken into account in order to design the sewerage system, while the permitted boundaries that determine the environmental quality standard and discharge of sewages of the book were taken into account from the book VI of the TULSMA in order to select and design the murky-waters treatment plant. A brief description of the general and specific objectives, and how far have these objectives been achieved in order to accomplished the goal of the project will be found on the first paragraph. The second chapter deals with the theoretical foundation, where the main definitions are presented according to normative methods. The third chapter deals with the general information of the project area as well as the geographical location, description of the place under study, socioeconomic analysis, among others. In the fourth chapter, information about how the design parameters are established, both for the sewerage system and for the treatment plant, growth rates, drinking water supplies, future estimation methods, and others like engineering studies, and topographic study are determined. The fifth chapter offers the valuation of the existing combined sewer system, with its respective conclusions and solutions, as well as the design of the new combined sewerage system and the design of the treatment system selected for this purpose. In chapter six, a detailed list of the referential budget and the technical specifications to carry out this project is given. Finally, a conclusion gotten after the study is done and given in the seventh chapter. This conclusion responds to the objectives that were established. Also here a list of recommendations for the correct execution, and efficient operation of the project is found. Lastly, the construction plans of the project are attached to it. Keywords: